-
Installation of over 150 PCs with networking and installation of HP Net server on Windows NT platform at
BroadCast Equipment India Ltd.
-
Installation and commissioning of IBM RISC server with installation of over 60 nodes at Indian Airlines Ltd.
-
Work performed for the Election Commission U.P for the Voter ID card through networked computers at different locations.
-
Installation of over 80 computers with connectivity through 40 VT Terminals and IBM RISC 600 server, installation and commissioning of computers and distribution of Mails through mail server at different users.
-
Installation and commissioning of over 1500 computers and 1000 printers at different BPO location
-
Annual Maintenance Contract of over thousands of computers at different corporate locations.
-
Annual Maintenance contract for HP/ IBM/ Dell Servers and Nodes at 8 different location comprising of 18m high end servers.
-
Development of website with proper information for Indian Army
-
(www.dreamersclub.army.in)
-
Customized Software Development for Indian Army to maintain the records of Trials conducted by them.
-
Linux Network based Data-Base Management Software for Indian Army.
-
Inventory & Accounts Management Software for Usha Shri Ram Hotels.
-
Automation of Army new building and providing the Barcode and smartcard implementation.
-
Done implementation of Smartcard at MO for Single sign On Manager for complete Network.
| Project Name
|
Operation Logistic Directorate |
| Client
|
Indian Army |
| Description
|
The OPLGS s/w is running on the army intranet ,this system maintains the
policy details and provide the support to officers to monitor the policy
in a manner way . In this s/w client can save the records according to the
need and they can also view , modify, and update the record as per need
. And client can generate the report as a crystal format as per need .
|
| Technology
|
1. OS Need - Sun Solaris
2. Tools -
WebLogic /Tomcat server,
Crystal
Report 11,
Macromedia Dreamweaver MX .
3. Framework-Struts and J2ee
|
| Methodology
|
RUP (Rational unified process)
|
| Testing tool
|
Rational Rose(IBM) |
| Front End
|
Java |
| Back End
|
ORACLE 10g |
| Duration
|
One Year |
| Team Size
|
4 |
| Project Name
|
Dreamers Club |
| Client
|
Indian Army |
| Description
|
Online idea sharing & collaborating with
a procedure to give positive idea for better match.
|
| Technology
|
1. OS Need - Linux (red hat)
2. Tools -
Net beans (IDE),
Crystal
Report 8,
3. Framework-Struts and J2ee
|
| Methodology
|
SDLC
|
| Testing tool |
Manual Testing |
| Front End
|
Java |
| Back End
|
My Sql |
| Duration
|
6 Month |
| Team Size
|
3 |
| Project Name
|
E-Gateway |
| Client
|
E-Gateway |
| Description
|
|
| Technology
|
1. OS Need - WindowXP
2. Tools -
Macromedia Dreamweaver MX .
Macromedia FleshMX
|
| Methodology
|
SDLC
|
| Testing tool
|
Manual Testing |
| Front End
|
ASP, HTML |
| Back End
|
NA |
| Duration
|
2 Weeks |
| Team Size
|
2 |
|